Thruway Authority Announces Eastbound Overnight Ramp Closure at Interchange 25A (Binghamton, I-88)
Motorists Advised to Follow Signed Detour Route
ALBANY, NY (10/09/2009)(readMedia)-- The New York State Thruway Authority today announced the eastbound exit ramp at Interchange 25A (Binghamton, I-88) will be closed at 6:00 p.m. on Monday, October 12, 2009 until 6:00 a.m. on Tuesday, October 13, 2009, to perform pavement work, weather permitting.
The westbound ramps and the eastbound entry ramp will remain open during this project. In the event of inclement weather, the pavement work will take place on Tuesday, October 13, 2009.
Eastbound motorists seeking access to I-88 are advised to follow the signed detour route, directing them to continue east on I-90 to Interchange 25 (Schenectady, I-890), then take I-890 westbound to High Bridge Road Exit 8, turn left at the traffic light at the end of the ramp and turn left at the next traffic light to re-enter I-890 eastbound. Motorists should then re-enter the Thruway (I-90) westbound and exit at Interchange 25A.
The Authority will activate its Dynamic Message Signs (DMS) in advance of the area to provide motorists with notice of the construction and required ramp closure.
Motorists are reminded to remain alert and aware of their surroundings while traveling through the work zone, and to obey all posted work zone speed limits. Motorists should also keep in mind that speeding fines are doubled in work zones.
This work is being completed as part of the on-going $4.98 million roadway resurfacing project between Interchange 23 (Downtown Albany, I-787) and Interchange 24 (Albany, I-87/I-90). The project also includes paving the entrance and exit ramps of Albany Interchanges 23 and 24, Schenectady Interchange 25 (I-890) and Schenectady Interchange 25A (I-88). The project, scheduled for completion in November 2009, is being completed by Callanan Industries Inc. of Schenectady, New York.
The Authority appreciates motorists' patience and understanding while this essential project takes place.
-30-
Want to create your own news and distribute it in minutes?
News From

New York State Thruway Authority
Contact Information
- Office of Media Relations & Public Affairs, 518-436-2983
Share this News
Recent News
- Thruway Authority to Continue Tappan Zee Bridge Deck Replacement Project
- Thruway Authority Announces Brief Traffic Stops Near Interchange 28 (Fultonville)
- Authority Announces Lane Shifts for 15-mile Reconstruction Project between Interchanges 39 & 40 Set to Resume
- Thruway Authority Announces Ramp from Scajaquada to I-190 Southbound to Temporarily Close Beginning March 19
- Thruway Authority Announces Rolling Road Block For Reconstruction in Syracuse Area This Afternoon
- Tappan Zee Bridge Repairs To Continue
- Thruway Authority Announces Westbound Motorists in Syracuse impacted by Rolling Road Block Thursday, March 18
- Repairs to Tuckahoe Road Overpass on I-87 to Necessitate Lane Closures
- 2nd Traffic Update for Newburgh-Beacon Bridge Accident
- Traffic Advisory Update for Newburgh-Beacon Bridge
- TRAFFIC ADVISORY - ACCIDENT NEWBURGH-BEACON BRIDGE TOLL PLAZA






