HARRISBURG, PA (06/04/2010)(readMedia)-- The Pa. Satellite News Service today will provide a 3:30 p.m. satellite feed of a morning news conference: Officials from the Pennsylvania Turnpike and its partners marked the opening of a Truck Stop Electrification (TSE) facility at its New Stanton Service Plaza at milepost 77.6 off the westbound lanes of I-76 in Westmoreland County.
The TSE, developed by CabAire LLC, Enfield, Conn., is comprised of towers equipped with modules that fit into truck-cab windows to provide heat, air conditioning, internet, TV and electrical power to trucks and other diesel-powered vehicles while the engine is shutoff.
Presently the only one of its kind in the state, the TSE is designed to help reduce pollution and land-development impacts to neighborhoods surrounding the travel plaza - and just one of several steps the Turnpike is taking towards a greener environment.
The satellite feed includes interviews with Turnpike CEO Joe Brimmeier, officials cutting the ribbon on the TSE, and b-roll of how the TSE towers are used by truckers.
Feed Facts
EVENT: PA TURNPIKE
DATE: Friday, June 4, 2010
TIME: 15:30 to 15:45 (Eastern)
FORMAT: 16 x 9
SATELLITE: AMC - 5 (KU-Band - DIGITAL)
TRANSPONDER: K 14
CHANNEL: F (9Mhz)
SYM RATE: 6.380 msps
FEC: 5/6
BIT RATE: 9.799346
DOWNLINK POL: Horizontal
DOWNLINK FREQ: 12113.50 MHz
AUDIO: 6.2 / 6.8
TROUBLE: 717-772-4282